2、施工建造单位良莠不一,因此,选择有经验的专业施工队伍是非常重要的事情。
3、目前我国还缺少对洁净手术室建造质量的监管措施和规范评价手术室建造质量的标准
1.无影灯根据手术室尺寸和手术要求进行配置,采用多头型;调平板的位置在送风面之上,距离送风面不小于5cm。1. are configured according to the requirements of shadowless lamp size and operation room surgery,icu净化工程安装, the head po*ition adjustment plate; on the air,icu净化工程设计, the air surface distance of not less than 5cm.2.手术台长向沿手术室长轴布置,台面中心点与手术室地面中心相对应。The 2. station along the long axis to the surgical operation room layout, the center point and the center of the ground surface corresponding to the operation room.3.手术室计时采用兼有麻计时、手术计时和一般计时功能的计时器。手术室计时器有分、秒的清楚标识,并配置计时控制器,停电时能自动接通自备电池,自备电池供电时间不低于10h。计时器设在患者不易看到的墙面上方,距地高度2m。
3. operation room timing, both with anesthesia timing,icu净化, surgery timing and general timekeeping function timer. Operation room timer has minutes and seconds of clear identification, and configuration timing controller,icu, power failure can automatically connect to own batteries, self battery, power supply time is not less than 10h. The timer is located above the wall which is not easy to see by the patient. The height is 2m.