2. 层流设备

2. laminar flow equipmentICU的防污染要求比较高,因为在ICU中,各种继发性疾病常引起呼吸衰竭,病人须紧急气管切开、紧急开胸等手术,icu,也包括正常术后病人的复苏,因此,在现 代ICU病房设计时要考虑使用层流净化设施,减少感染机率。ICU内温度应维持在24±1.5℃;老年患者病房温度在25.5℃左右。Anti pollution requirements of ICU is relatively high, because in ICU, various secondary diseases often cause respiratory failure, the patient must emergency tracheotomy and emergency thoracotomy surgery, including the patient's normal po*toperative recovery, therefore, in the modern design of the ICU ward to consider when using the laminar flow purification facilities, reduce the risk of infection. The temperature in ICU should be maintained at 24 + 1.5; the temperature of the elderly patients in the ward is about 25.5.









1.9配电箱

   在ICU内的墙上的配电箱内设有总开关和电插座箱、开关面板、设备带、照明灯分开关,icu病房,当某一用电部分发生故障时,可立即关闭该分路开关,以保证其他用电回路供电。当某一配电箱跳闸时,可先断开有问题的分开关,然后按下总开关的复位键,icu,再合上总开关送电。若不能恢复正常供电,应立即通知维修部门检修。

2  ICU洁净度和细菌浓度的测试

2.1洁净ICU病房检测前,系统应已静态运行60 min。在确认风速、换气次数和静压差的检测无明显问题之后,再检测含尘浓度。

2.2当送风口集中布置时,应对手术区和周边区分别检测,测点数和位置应符合医院洁净手术部建筑技术规范(GB 50333—2002)表lO.3.8—2的规定;当附近有显著障碍物时,可适当避开。当送风口分散布置时,按全室统一布点检测,测点可均布,但不应布置在送风口正下方。