1.无影灯根据手术室尺寸和手术要求进行配置,采用多头型;调平板的位置在送风面之上,距离送风面不小于5cm。1. are configured according to the requirements of shadowless lamp size and operation room surgery, the head po*ition adjustment plate; on the air, the air surface distance of not less than 5cm.2.手术台长向沿手术室长轴布置,台面中心点与手术室地面中心相对应。The 2. station along the long axis to the surgical operation room layout, the center point and the center of the ground surface corresponding to the operation room.3.手术室计时采用兼有麻计时、手术计时和一般计时功能的计时器。手术室计时器有分、秒的清楚标识,并配置计时控制器,菏泽icu,停电时能自动接通自备电池,icu病房一天多少钱,自备电池供电时间不低于10h。计时器设在患者不易看到的墙面上方,距地高度2m。
3. operation room timing,icu净化施工, both with anesthesia timing, surgery timing and general timekeeping function timer. Operation room timer has minutes and seconds of clear identification, and configuration timing controller, power failure can automatically connect to own batteries, self battery, power supply time is not less than 10h. The timer is located above the wall which is not easy to see by the patient. The height is 2m.
4、洁净手术室建成后应由有资格、有权威的第三方对所建成的手术室进行调试、检测和对手术室的建造质量,包括建筑装修的材料、净化空调系统的运行状况和稳定性,手术室的性能参数(洁净度、菌落数、温湿度、压力、噪声等)以及手术室选用的设备的可靠性和系统运行的节能等进行全面的评价,以进一步规范洁净手术室的建造市场。
5、医院投入的管理力量和人员比较欠缺,也是影响洁净手术室建造质量的另一个方面。