山东康德莱净化工程有限公司

临沂icu、山东康德莱净化、icu病房安装

山东康德莱净化工程有限公司

  • 主营产品:医院ICU净化,电子厂无尘车间,药厂GMP车间净化,手术室净
  • 公司地址:济南市天桥区蓝翔路15号时代总部基地一期第二部分六区5号楼6-15室
咨询热线: 13256749842
立即咨询 QQ咨询
信息详情
icu病房安装,icu车间净化,icu净化设备,icu

1.无影灯根据手术室尺寸和手术要求进行配置,采用多头型;调平板的位置在送风面之上,距离送风面不小于5cm。1. are configured according to the requirements of shadowless lamp size and operation room surgery, the head po*ition adjustment plate; on the air, the air surface distance of not less than 5cm.2.手术台长向沿手术室长轴布置,台面中心点与手术室地面中心相对应。The 2. station along the long axis to the surgical operation room layout,icu病房安装, the center point and the center of the ground surface corresponding to the operation room.3.手术室计时采用兼有麻计时、手术计时和一般计时功能的计时器。手术室计时器有分、秒的清楚标识,莱芜icu,并配置计时控制器,停电时能自动接通自备电池,自备电池供电时间不低于10h。计时器设在患者不易看到的墙面上方,距地高度2m。

3. operation room timing,icu净化设备, both with anesthesia timing, surgery timing and general timekeeping function timer. Operation room timer has minutes and seconds of clear identification, and configuration timing controller, power failure can automatically connect to own batteries, self battery, power supply time is not less than 10h. The timer is located above the wall which is not easy to see by the patient. The height is 2m.










6.手术间应有亮度好、易于调节和便于清洁的吊式或立式母子无影灯照明。

7.设有中心吸引及中心供氧系统。

8.有教学任务的医院考虑设电视教学装置,或与手术室隔离的手术看台及音控对话机等。

9.高压氧舱手术室及治疗室内部要求根据相关要求。

10.如不能达到上述要求,可按具体情况及条件进行设计,原则上要求达到手术室内无蚊蝇、室内空气清洁、无尘埃下落,与周围通道保持一定距离。冷天有取暖设备,照明好即可。


icu车间净化|临沂icu|山东康德莱净化由山东康德莱净化工程有限公司提供。山东康德莱净化工程有限公司(www.kdljh.com)优质的服务和产品,不断地受到新老用户及业内人士的肯定和信任。我们公司是全网商盟认证会员,点击页面的商盟客服图标,可以直接与我们客服人员对话,愿我们今后的合作愉快!